Element cost changes (such as provider re-rates) are handled through Re-rate/Change MRR action. The following happens as a result of the action:
- Element Monthly Recurring Cost (MRC) field is adjusted.
- An element change record is created.
If the effective date is in the future, the operation is saved and scheduled for future processing on the effective date.
To change element cost:
- Open element details.
- Click Re-rate/Change MRC.
- Adjust Effective Date (current date is provided as default).
- Adjust New MRC (current MRC is provided as default).
- Provide optional change description.
- Click Save.
Please read more about applying changes to elements here.