Changing Element Cost

Element cost changes (such as provider re-rates) are handled through Re-rate/Change MRR action. The following happens as a result of the action:

  1. Element Monthly Recurring Cost (MRC) field is adjusted.
  2. An element change record is created.

If the effective date is in the future, the operation is saved and scheduled for future processing on the effective date.

To change element cost:

  1. Open element details.
  2. Click Re-rate/Change MRC.
  3. Adjust Effective Date (current date is provided as default).
  4. Adjust New MRC (current MRC is provided as default).
  5. Provide optional change description.
  6. Click Save.

Please read more about applying changes to elements here.